Construction SWPPPs that get your site permitted and keep it compliant
If your project disturbs an acre or more, you need coverage under a construction stormwater permit, and that starts with a Stormwater Pollution Prevention Plan (SWPPP). We write the plan, help file the Notice of Intent, and can handle inspections through final stabilization.
- Nationwide service with local field professionals
- SWPPPs written to your state's construction general permit
- Site maps, BMP details and inspection forms included
- NOI and NOT filing support
- Ongoing inspections available
Prefer to talk to someone? (877) 774-2731
What is a SWPPP?
A Stormwater Pollution Prevention Plan (SWPPP) is the site-specific plan a construction operator must prepare to get coverage under a Clean Water Act construction stormwater permit. It describes the project, maps drainage and discharge points, and sets out the erosion and sediment controls, pollution prevention measures, inspection schedule and corrective action procedures that will keep sediment and other pollutants out of stormwater.
Under EPA's Construction General Permit (CGP) and the state permits modeled on it, the SWPPP has to be completed before you submit your Notice of Intent (NOI), kept on site or accessible to inspectors, and updated as the work changes. Most states issue their own construction general permit; EPA issues it directly in a few places, including Massachusetts, New Hampshire, New Mexico, Washington, D.C., and most Indian country.
Does your project need a SWPPP?
- You are clearing, grading or excavating 1 acre or more, including staging areas and stockpiles
- Your lot is under an acre but part of a subdivision or phased development that totals an acre or more
- Your lender, municipality or general contractor has asked for a SWPPP or a copy of your NOI
- You are a builder, developer or contractor taking over an existing permitted site
- Your site discharges to an impaired water or sensitive area that triggers extra requirements
Not sure? Send us a few details and we'll tell you whether the rule applies before you spend anything.

Our SWPPP service covers
Topography, drainage areas, receiving waters, impaired water and endangered species screening.
Silt fence, inlet protection, construction entrances, sediment traps and basins, sized and placed for your site.
Disturbance limits, BMP locations, discharge points, stockpiles, washout and staging areas.
Temporary and permanent stabilization schedules tied to your construction sequence.
Fueling, concrete washout, waste, dewatering and material storage controls.
Preparing and filing the Notice of Intent and, at the end, the Notice of Termination.
Inspection forms, schedules and corrective action logs, plus field inspections where you need them.
SWPPP updates as plans change and stormwater team training records.
Discharging stormwater from a construction site without permit coverage, or without following your SWPPP, is a Clean Water Act violation. Penalties are assessed per day, per violation, and can run to tens of thousands of dollars a day. Stop-work orders from local inspectors can cost even more in delays.
From request to permit coverage in four steps
- 1
Send the basics
Location, acreage and project type. Upload a site plan or grading plan if you have one.
- 2
Quote and scope
We confirm your state's permit requirements and send a fixed quote, usually the same business day.
- 3
Plan prepared
We prepare the SWPPP, maps and forms, and support the NOI filing.
- 4
Stay compliant
Optional inspections, amendments and NOT filing through final stabilization.
Who we help
- Developers and builders starting residential, commercial or industrial projects
- General contractors who need a SWPPP before mobilizing
- Utility, solar and linear projects crossing multiple drainage areas
- Owners and lenders who need proof of permit coverage
Why Breeze
- One project manager from quote to final deliverable
- Nationwide coverage with local field professionals
- Fixed quotes before any work starts
- Average response time 1 hour during business hours
Request your SWPPP quote
Send the details below and a project manager will reply with scope, price and timing. Average response time 1 hour during business hours.
- No obligation and no payment details
- Fixed quote before any work starts
- Upload plans or lists if you have them
Prefer to talk to someone? (877) 774-2731
SWPPP questions
What is a SWPPP?
A Stormwater Pollution Prevention Plan (SWPPP) is a site-specific plan required for coverage under a construction stormwater permit. It identifies sources of stormwater pollution on a construction site and describes the erosion and sediment controls, pollution prevention measures, inspections and corrective actions the operator will use to keep pollutants out of stormwater.
When is a SWPPP required?
Under EPA's Construction General Permit and the state permits based on it, a SWPPP is required for construction activity that disturbs 1 acre or more of land, or less than 1 acre if it is part of a larger common plan of development or sale that will disturb 1 acre or more. Some states and municipalities have lower thresholds.
How much does a SWPPP cost?
Cost depends on acreage, the state permit, site complexity and whether you need inspections. Send us the project location, acreage and a site plan and we'll send a fixed quote, typically the same business day.
What is the difference between a SWPPP and an NOI?
The SWPPP is your plan. The Notice of Intent (NOI) is the form you file with EPA or your state to request coverage under the construction general permit. Most permits require the SWPPP to be completed before the NOI is submitted.
How often do SWPPP inspections have to happen?
Under EPA's 2022 Construction General Permit, inspections must be done at least once every 7 calendar days, or once every 14 calendar days and within 24 hours of a storm event of 0.25 inches or more. State permits set their own schedules, and sites discharging to sensitive waters may need more frequent inspections.
Who has to sign the SWPPP?
The permittee (the operator with control over the project) certifies the SWPPP and NOI. Some states also require the plan to be prepared or inspected by a credentialed professional, such as California's Qualified SWPPP Developer (QSD) and Qualified SWPPP Practitioner (QSP).
When can I end permit coverage?
Once construction is complete and the site has reached final stabilization, you file a Notice of Termination (NOT). Under EPA's CGP, final stabilization generally means 70% of the natural background vegetative cover, or equivalent permanent stabilization, across disturbed areas.
Do you work in every state?
Yes. We prepare SWPPPs nationwide and write each plan to the construction general permit that applies where your project is located. Site inspections are available in most areas through our local field network.
Related services
Nationwide service, with local professionals on the ground
We work in all 50 states and Washington, D.C., and every site visit is done by a field professional based near your property: someone who knows the local terrain, building stock, regulators and access. Your project manager coordinates the field work, so you get one point of contact and the same scope and report quality wherever your property is.
- Local field professionals in all 50 states and Washington, D.C.
- One project manager and one consistent report format for every site
- Single sites or multi-site portfolios across many states
- Average response time 1 hour during business hours
Trusted by top banks, brands and development companies




















Get your SWPPP quote today.
Fixed pricing, nationwide coverage. Average response time 1 hour during business hours.